switchyard

The control plane for coding agents

PARALLEL WORK. SHARED DIRECTION.

More agents.Same rigor.

Coordinate work across coding agents, review, and CI. Switchyard plans parallel runs, applies your merge policy, and keeps the evidence with each change.

YOUR REPOS. YOUR MODELS. YOUR RULES.

Example workflowSimulated data

Explore the full line

ENGINEERS USER FEEDBACK SUPPORT TICKETS LOGS + ALERTS SECURITY SCANS TRIAGE QUEUE: LITE QUEUE: STANDARD QUEUE: DEEP REVIEW VALIDATE · EXAMPLE BATCH MAIN NEEDS HUMAN APPROVAL
Merged in example 0 In review 0 Awaiting validation 0/5 Needs approval 0 Findings 0

From activity to delivery

More work started is only the beginning.

Parallel agents create more changes to coordinate. Dependencies need an order. Pull requests need review. The combined result needs to pass its checks.

When work piles up

  • Several agents are assigned overlapping changes.
  • Pull requests wait for the right review.
  • Approved changes still need integration.
  • A session stops without a clear outcome.
  • The same finding appears in several places.

What Switchyard coordinates

  • Dispatch planning uses declared paths and dependencies to identify work that needs to run in sequence.
  • Review routes follow the change’s risk and configured requirements.
  • Combined validation checks how changes fit together before merge.
  • Supervision records its state and supports the configured recovery or escalation path.
  • Triage checks for duplicates and keeps the evidence connected to the issue.

The workflow

A clear route from issue to main.

Switchyard coordinates the handoffs around agent work. Each stage adds the information the next stage needs.

STATION 03

Dispatch

Run parallel work with a plan.

Plan each wave around declared paths, dependencies, and available capacity. Agents work in isolated worktrees, with supervision tracking progress and surfacing stalled sessions. Pull requests follow the review route required for their risk tier.

REVIEW REVIEW RETRY ISOLATED WORKTREES

SUPERVISED PARALLEL SIDINGS · SIMULATION

EXAMPLE DISPATCHSIMULATED DATA
Illustrative dispatch log

Before agents start

Plan the wave before it runs.

Check capacity, match the work, and plan around dependencies before starting the next run.

Capacity

Check capacity.

Use available provider usage data, estimated task cost, and the reserve you set to size the next run.

Effort

Match the work.

Choose an implementation lane and model configuration suited to the task. Assess risk separately to determine review and merge requirements.

Dependencies

Check dependencies.

Use declared scope and blocking relationships to identify work that can proceed together and work that must wait.

Supervision

Supervise the result.

Track sessions through the run and surface failures or stalled progress for the configured next action.

An illustration of work moving through dispatch, review, and merge.Simulated data
Example workflow · Simulated data --:--:--
IssueWorkLaneImplementation / reviewStatus
DEMO-101Add request retry handlingstandardImplementation / independent reviewMERGED
DEMO-102Validate compatible pull requestsintegrationRequired checksCHECKS RUNNING
DEMO-103Fix pagination in audit exportliteImplementation / independent reviewWAITING FOR REVIEW
DEMO-104Review a protected repository setting · r4humanPerson controls the actionNEEDS HUMAN APPROVAL
DEMO-105Improve request retry handlingdeepImplementation / independent reviewDISPATCHED
DEMO-106Update request validationstandardImplementation / independent reviewTRIAGED

Before merge

Review should match the risk.

A documentation update and a production change need different evidence. Switchyard routes review by risk and checks that required evidence applies to the current revision.

  • Use independent review where required. Configure implementation and review roles according to the review policy, including provider separation for model review.
  • Give higher-risk changes deeper review. The route determines the expected review and checklist evidence.
  • Keep changes and evidence together. A new revision can require fresh review and validation before it is eligible to merge.
  • Make stalled review visible. Repeated failures or lack of progress should lead to a clear next action under the supervision policy.
ILLUSTRATIVE REVIEW FLOW Implementation role ↓ code and evidence Independent review, where required ↳ fixes return to implementation Required evidence ↓ applicable policy and CI checks Merge eligibility

Requirements follow risk and repository policy.

Review and routing details

Implementation effort and risk are separate decisions.

Implementation effort

LanePurpose
LiteRoutine work with lower implementation intensity.
StandardThe default agent implementation route.
DeepComplex work needing greater implementation depth.
HumanWork assigned to a person by policy or explicit routing.

Change risk

Risk tierCurrent review route
r0Policy and routed CI; no model review required.
r1A lightweight model review.
r2Independent strong review and expected checklist evidence.
r3Release review with strong model reviewers and expected supporting evidence.
r4Human approval and human-controlled application or merge; agents may prepare evidence.

Repository policy and an issue’s explicit requirements determine the applicable gates. All changes must satisfy the required policy and CI checks.

Keep work within its limits

Set the conditions for the next move.

Plan capacity, manage the flow of work, and protect unfinished changes.

Illustrative governor readings

Capacity

Plan dispatch using available usage data and estimated costs. Reserve headroom and adjust new work as capacity changes.

Flow

Use backlog limits to slow or pause dispatch while review and integration catch up.

Cleanup

Identify completed workspaces for cleanup under the configured policy. Dirty workspaces remain protected from automatic removal.

Example readings · Simulated data, not live operating metrics.

Where people stay in charge

Clear decisions. Required evidence.

Make the conditions for human action and merge explicit.

Human decisions

Keep people in control.

Route human-only work to a person. r4 changes require recorded approval and human-controlled application or merge. Other changes can also require human approval when their issue or policy specifies it.

Merge requirements

Check before changes land.

Enforce the applicable policy, review, and validation requirements before changes reach the main branch.

Start with one repository

Make the first run easy to inspect.

Start small and use the evidence from your first run to decide what comes next.

Step 1

Check the setup

Run the preflight check and try a local plan with sample issues. See what is required before connecting live services.

Step 2

Connect the workflow

Add Linear for live issue state, then configure the GitHub and Conductor or Superset tooling required for automation. Review the lifecycle, permissions, and merge requirements for your repository.

Step 3

Run a small wave

Start with a small set of low-risk issues. Inspect the dispatch plan, follow the review and validation results, and use that evidence to decide what to run next.

Request a pilot

Know why a change shipped

Keep the evidence with the work.

Connect the issue, pull request, review, and validation results. Inspect the supporting record to see why a change is ready to merge or what needs attention.

01Build on repository protections.

Switchyard’s workflow works with protected branches and required checks. Protected settings remain under human control.

02Scope the permitted actions.

Mediated agent sessions use the configured access profile and issue scope. The deployment’s permissions and enforcement determine what each actor can do.

03Choose the deployment you need.

Start with local planning, connect Linear for live workflow state, and add the tooling required for automated agent runs. Hosted workers, alerts, and backups are optional operations add-ons.

Before you start

Questions

What does Switchyard coordinate?
Switchyard coordinates the workflow around coding agents: issue intake, triage, dispatch, review, CI, and merge. It also tracks sessions and carries findings into follow-up work.
What do we need to get started?
Core provides local planning and policy tools using Git and a local issue store. Connected adds Linear for live workflow state. Automated adds the GitHub and Conductor or Superset setup required to run the agent workflow. The quickstart explains the requirements for each tier.
Can we use our existing agents and model accounts?
Switchyard separates implementation and review roles and configures them through supported integrations. The usable accounts, models, and capacity data depend on the selected integration and deployment. Confirm the supported setup for your pilot before planning around a particular provider or subscription.
Can Switchyard merge changes automatically?
Yes, for eligible r0–r3 changes after all applicable gates pass. r4 changes are human-driven and never merge autonomously; agents may prepare evidence. An issue can specify additional approval requirements. Automated merging still operates within the repository's protections and Switchyard's finalization checks.
What happens when an agent gets stuck?
Supervision records session state and identifies stalled or failed work. The configured policy determines whether to retry, requeue, or escalate it, with evidence available for the next decision.
What does it cost to run?
Operating costs depend on model usage, review iterations, CI, and infrastructure. Dispatch planning uses available capacity information and estimated task costs to help plan the workload. Shared validation can reduce repeated CI work; actual savings depend on the changes and checks involved.
How does independent review work?
For changes that require model review, the configured route determines the reviewer and evidence required. Provider separation is part of the model-review policy. r0 changes require policy and CI checks without a model review; r4 follows the human review route.
Does every change require a person to approve it?
No. Current policy allows eligible r0–r3 changes to proceed when their applicable gates pass. r4 changes require recorded human approval and a person to control application or merge. An issue may explicitly require approval at another tier.

Start with a pilot

Put your backlog
on rails.

Start with one repository and a small set of issues. See how dispatch, review, and merge work together before expanding the workflow.