More agents.Same rigor.
Coordinate work across coding agents, review, and CI. Switchyard plans parallel runs, applies your merge policy, and keeps the evidence with each change.
YOUR REPOS. YOUR MODELS. YOUR RULES.
Explore the full line
From activity to delivery
More work started is only the beginning.
Parallel agents create more changes to coordinate. Dependencies need an order. Pull requests need review. The combined result needs to pass its checks.
When work piles up
- Several agents are assigned overlapping changes.
- Pull requests wait for the right review.
- Approved changes still need integration.
- A session stops without a clear outcome.
- The same finding appears in several places.
What Switchyard coordinates
- Dispatch planning uses declared paths and dependencies to identify work that needs to run in sequence.
- Review routes follow the change’s risk and configured requirements.
- Combined validation checks how changes fit together before merge.
- Supervision records its state and supports the configured recovery or escalation path.
- Triage checks for duplicates and keeps the evidence connected to the issue.
The workflow
A clear route from issue to main.
Switchyard coordinates the handoffs around agent work. Each stage adds the information the next stage needs.
Intake
Give the work a clear starting point.
Capture requests and findings as structured issues, with scope, risk, and a clear outcome. Intake validation identifies missing required information before work moves forward.
INTAKE VALIDATION
Triage
Put work in the right order.
Check for duplicates, record dependencies, and choose an implementation lane. Routine changes and complex work can take different routes, while risk determines the review and approval requirements.
IMPLEMENTATION LANES
Dispatch
Run parallel work with a plan.
Plan each wave around declared paths, dependencies, and available capacity. Agents work in isolated worktrees, with supervision tracking progress and surfacing stalled sessions. Pull requests follow the review route required for their risk tier.
SUPERVISED PARALLEL SIDINGS · SIMULATION
Integrate
Check how the changes fit together.
Group compatible pull requests for integration and validate the combined result against the current main branch. Required policy, review, and CI evidence must be in place before the selected changes can merge.
BATCHED CONVERGENCE TO MAIN
Follow up
Keep the next step connected.
Capture findings from implementation, review, and validation as follow-up issues. Preserve the source and evidence so triage can assess the next piece of work in context.
FINDINGS RETURN TO INTAKE
Before agents start
Plan the wave before it runs.
Check capacity, match the work, and plan around dependencies before starting the next run.
Check capacity.
Use available provider usage data, estimated task cost, and the reserve you set to size the next run.
Match the work.
Choose an implementation lane and model configuration suited to the task. Assess risk separately to determine review and merge requirements.
Check dependencies.
Use declared scope and blocking relationships to identify work that can proceed together and work that must wait.
Supervise the result.
Track sessions through the run and surface failures or stalled progress for the configured next action.
| Issue | Work | Lane | Implementation / review | Status |
|---|---|---|---|---|
| DEMO-101 | Add request retry handling | standard | Implementation / independent review | MERGED |
| DEMO-102 | Validate compatible pull requests | integration | Required checks | CHECKS RUNNING |
| DEMO-103 | Fix pagination in audit export | lite | Implementation / independent review | WAITING FOR REVIEW |
| DEMO-104 | Review a protected repository setting · r4 | human | Person controls the action | NEEDS HUMAN APPROVAL |
| DEMO-105 | Improve request retry handling | deep | Implementation / independent review | DISPATCHED |
| DEMO-106 | Update request validation | standard | Implementation / independent review | TRIAGED |
Before merge
Review should match the risk.
A documentation update and a production change need different evidence. Switchyard routes review by risk and checks that required evidence applies to the current revision.
- Use independent review where required. Configure implementation and review roles according to the review policy, including provider separation for model review.
- Give higher-risk changes deeper review. The route determines the expected review and checklist evidence.
- Keep changes and evidence together. A new revision can require fresh review and validation before it is eligible to merge.
- Make stalled review visible. Repeated failures or lack of progress should lead to a clear next action under the supervision policy.
Requirements follow risk and repository policy.
Review and routing details
Implementation effort and risk are separate decisions.
Implementation effort
| Lane | Purpose |
|---|---|
| Lite | Routine work with lower implementation intensity. |
| Standard | The default agent implementation route. |
| Deep | Complex work needing greater implementation depth. |
| Human | Work assigned to a person by policy or explicit routing. |
Change risk
| Risk tier | Current review route |
|---|---|
| r0 | Policy and routed CI; no model review required. |
| r1 | A lightweight model review. |
| r2 | Independent strong review and expected checklist evidence. |
| r3 | Release review with strong model reviewers and expected supporting evidence. |
| r4 | Human approval and human-controlled application or merge; agents may prepare evidence. |
Repository policy and an issue’s explicit requirements determine the applicable gates. All changes must satisfy the required policy and CI checks.
Keep work within its limits
Set the conditions for the next move.
Plan capacity, manage the flow of work, and protect unfinished changes.
Illustrative governor readings
Capacity
Plan dispatch using available usage data and estimated costs. Reserve headroom and adjust new work as capacity changes.
Flow
Use backlog limits to slow or pause dispatch while review and integration catch up.
Cleanup
Identify completed workspaces for cleanup under the configured policy. Dirty workspaces remain protected from automatic removal.
Example readings · Simulated data, not live operating metrics.
Where people stay in charge
Clear decisions. Required evidence.
Make the conditions for human action and merge explicit.
Keep people in control.
Route human-only work to a person. r4 changes require recorded approval and human-controlled application or merge. Other changes can also require human approval when their issue or policy specifies it.
Check before changes land.
Enforce the applicable policy, review, and validation requirements before changes reach the main branch.
Start with one repository
Make the first run easy to inspect.
Start small and use the evidence from your first run to decide what comes next.
Check the setup
Run the preflight check and try a local plan with sample issues. See what is required before connecting live services.
Connect the workflow
Add Linear for live issue state, then configure the GitHub and Conductor or Superset tooling required for automation. Review the lifecycle, permissions, and merge requirements for your repository.
Run a small wave
Start with a small set of low-risk issues. Inspect the dispatch plan, follow the review and validation results, and use that evidence to decide what to run next.
Know why a change shipped
Keep the evidence with the work.
Connect the issue, pull request, review, and validation results. Inspect the supporting record to see why a change is ready to merge or what needs attention.
01Build on repository protections.
Switchyard’s workflow works with protected branches and required checks. Protected settings remain under human control.
02Scope the permitted actions.
Mediated agent sessions use the configured access profile and issue scope. The deployment’s permissions and enforcement determine what each actor can do.
03Choose the deployment you need.
Start with local planning, connect Linear for live workflow state, and add the tooling required for automated agent runs. Hosted workers, alerts, and backups are optional operations add-ons.
Before you start
Questions
What does Switchyard coordinate?
What do we need to get started?
Can we use our existing agents and model accounts?
Can Switchyard merge changes automatically?
What happens when an agent gets stuck?
What does it cost to run?
How does independent review work?
Does every change require a person to approve it?
Start with a pilot
Put your backlog
on rails.
Start with one repository and a small set of issues. See how dispatch, review, and merge work together before expanding the workflow.